Tuesday, September 27, 2011

5th Annual Crafty Ladies Retreat

On October 7 I leave for retreat. I cannot wait!

I have three projects chosen. The first is a BOM project that is a year old. The second is some more pillow cases for my grandson. The third is my current Breakfast Club project Cherry Cobbler.

More later.

Tuesday, May 31, 2011

NQA 42 Annual Quilt Show

I received confirmation of my class at the quilt show. It will be Saturday morning June 18. I am taking a class in Sashiko and am really looking forward to it. The afternoon will be spent rushing around the show and vendors. I am taking my running shoes.

Have a great day.

Tuesday, May 24, 2011

Friday night in ruins

Friday evening I was all set to sew and then the worst happened. Well maybe not the worst but certainly not a good thing for a FNSI. I was on call for work and got paged to come in.

Result: no sewing at all and no pictures at all.

Sorry. I blew it.

Have a great day.

Friday, May 20, 2011

FNSI

Tonight is the official FNSI. I have been working on my "Winning Hands" blocks all week long. I have completed about 15 of the 33 blocks needed for the king size top. I will try to take pictures as I progress tonight. (I know,I know I have promised before)...give me a break. Once I start sewing I don't even stop for bathroom duty until I absolutely have to.

Have a great weekend.

Wednesday, May 4, 2011

Rhapsody from Strip Club

The last two evenings have been filled with laying out the strips for the Rhapsody design. My quilters design table is just not large enough to spread out everything. I will have to get out my side table tonight to continue with the pattern. Since I am using a scrapy look the pattern has be to layed out piece by piece before any sewing can be done. I think it will turn out nice.
REMEMBER: Self, take pictures to share.
Have a great day.

Tuesday, May 3, 2011

Danish Scones

The quilt top is complete. The binding and backing have been chosen. All is in a separate package for the day when I get my quilting frame up.

This morning I had an epiphany on the way to work. My studio design was to include the quilting frame in the same room as the sewing machines. Now I am thinking that once I get everything out of the old sewing room and into the Studio I can set up the frame in the now empty sewing room and name it the quilting room. I can run a cable from the Dish transmitter in the Studio into the Quilting Room and set up a TV to watch my quilting and sewing programs. I will put the old DVD player in there and can watch all the movies that DH does not like.

What a mind bender!

Have a great day.

Thursday, April 21, 2011

Fed Up and doing something about it

I have finally decided that I cannot stay in the living room while my husband soaks up "Ghost Hunter's", "24 Hours"(a cop show) and similar programs that I do not enjoy. This week I issued my desire when he is watching these shows. I will go into my sewing studio and sew. WOW.l

The last two evenings I have been working on my project for "Breakfast Club". We are currently doing "Danish Scones" and I want to finish my quilt top before the 3rd Saturday in May. May will be the start of a new project "Blueberry Cobbler". I will need to go through my stash and pick out a light green shade, a background fabric and two tones of blue...unless I decide to may mine "Cherry Cobbler" and choose two tones of cherry red.

Have a great day.